MEL • UTC

MEL Calculator

Fast, clear UTC-based deferral deadline calculation for MEL Categories A, B, C and D.

✓ UTC-based calculation ✓ Categories A–D ✓ Instant validity status

MEL Day Validity Checker

Enter the defect date and select the applicable MEL category.

Current time (UTC) Loading...
MEL category
  • Defect logged
  • Interval
  • Counting starts
  • Today (UTC)

How to use it

1 Choose the date the defect was entered in the aircraft technical log, in UTC.
2 Select the MEL category shown against that item in the MEL.
3 For Category A, enter the number of days given in the remarks column.
4 Calculate to see the final valid date and days remaining.

Standard repair intervals

For B, C and D, the day of entry is not counted. Day 1 is the next calendar day.

Cat B 3 days
Cat C 10 days
Cat D 120 days
Cat A Per remarks

MEL repair categories

A category sets the longest time an item may remain inoperative. For B, C and D the day of entry is not counted: day 1 is the next calendar day, and the deferral runs to the end of the last day (23:59 UTC).

CategoryRectify within
AThe interval stated in the item's remarks (may be days, flights or hours)
B3 consecutive calendar days
C10 consecutive calendar days
D120 consecutive calendar days

Worked example

A Category C defect is logged on 5 March. Day 1 is 6 March, so day 10 is 15 March. The item must be rectified before the end of 15 March UTC.

What the MEL is

An aircraft normally cannot be released with known defects unless they are covered by an approved Minimum Equipment List. The operator's MEL is built from the Master MEL (MMEL) of the state of design. It lists equipment that may be inoperative for a flight, together with the operating and maintenance conditions that keep safety at an acceptable level. Anything that affects airworthiness and is not listed must work.

Limits of this tool

  • It counts calendar days only. Deferrals measured in flight hours, cycles or landings are not handled.
  • It gives the standard initial interval and does not include extensions.
  • Cat A intervals that are not whole days must be tracked separately.

Use with approved procedures

This calculator is intended as a quick study and practice aid. Real-world MEL control must always follow the approved MEL, operator procedures and the applicable authority requirements.

For study and practice only. Always follow your approved MEL, operator procedures and the authority's requirements for real deferrals.

Create New Account!

Fill the forms below to register

Retrieve your password

Please enter your username or email address to reset your password.